Level 9 – PAT System

• This system is currently operating at Level 9.
• Full GIS background layer enhance safety and productivity.
• The system is suitable for use in open pit- and plant areas with GPS and RTLS location technology available.
• All machines are part of a mesh radio network which enable the transmission of data from the machines to a back office.
• Intelligent linear dynamic zoning ensure safety at all speeds and traffic scenarios.
• Comprehensive back office with geofence capability.
• Continuous self diagnostics and health check with access control capability.
• The PAT Live Reporting application enable you to take proactive control of safety on your site.
• The Data Analysis application include among many reporting capabilities a playback function which facilitate effective incident analysis.
• Data is logged on the controller and on the back office.
• All operating parameters are configurable.
• Biometric key control, Electronic Tick List and fatigue management integration are available.
• Plug and play installation with strain-relief and tamper proof.
• Loading-mode and pairing with pedestrian units to avoid nuisance alarms.

Description

Level 9 – PAT System

OVERVIEW

• The system is ready to implement as a Level 9 machine to machine and machine to pedestrian
collision avoidance system, no other components are required when you need to move your site to level 9
• The L9 Controller will function as a L8 unit when L9 has not been implemented.
• ISO21815 compliant – all relevant UP tests passed.